Scholars' Bank will
be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected
on 9/16. Stay tuned for more updates!
Browsing Crescent Ranger District by Title
Navigation
Display Options
Results
-
Crescent Ranger District (Or.)
(2006-01-11)
Announces decision to categorically exclude and proceed with project thinning small trees on approximately 151 acres in 7 units to relieve overcrowding. Includes thinning 15-20 year-old trees not larger than 7 inches in ...
-
Crescent Ranger District (Or.)
(2007)
Announces decision to categorically exclude and proceed with project to enhance the meadow through cutting and girdling encroaching lodgepole pine into the meadow, and prescribed burning. Includes cutting trees 15-25 ...
-
Crescent Ranger District (Or.)
(2007-12-13)
Announces decision to categorically exclude and proceed with project implementing a riparian meadow/hydrologic function restoration project on 100 acres of Spruce Creek and an adjacent stringer meadow. Includes thinning ...
-
Crescent Ranger District (Or.)
(2007-09-12)
Announces decision to categorically exclude and proceed with project implementing a riparian meadow/hydrologic function restoration project in Spruce Creek and an adjoining stringer meadow. Includes thinning select lodgepole ...
-
Crescent Ranger District (Or.)
(2008-04-28)
Announces decision to categorically exclude and proceed with project thinning small trees on approximately 2590 acres in 89 units to increase the growth and health of overcrowded stands not likely of commercial value. ...
-
Crescent Ranger District (Or.)
(2000-02-28)
Announces decision to include further vegetation management activities with those of Alternative 3 of September 1998. Includes understory thinning of 2762 acres, prescribe burning of 904 acres of fire-tolerant stands to ...
-
Crescent Ranger District (Or.)
(1998-09-30)
Announces decision to implement modified version of Alternative 3 of project EA, understory thinning 5570 acres, harvesting 2.1 MMBF of salvage and 12.4 MMBF, and construction/reconstruction of 10.2 miles of road.
-
Crescent Ranger District (Or.)
(2001-02-23)
Announces decision to implement remaining portions of Alternate 3 of September 1998, including understory thinning, prescribed burning of fire-tolerant stands to relieve density, and harvesting of timber and salvage.
-
Crescent Ranger District (Or.)
(2001-11-01)
Announces, based on the original EA, a plant survey result, and an amended biological assessment, implementation of the remaining portion of the modified Alternative 3 within the range of the northern spotted owl. Includes ...
-
Crescent Ranger District (Or.)
(2002-11-05)
Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from ...
-
Crescent Ranger District (Or.)
(2002-09)
Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from ...
-
Crescent Ranger District (Or.)
(2001-04-04)
Announces decision to implement Alternative 2 of the project EA, amending the Deschutes National Forest Land and Resource Management Plan (Forest Plan) to incorporate management direction changes. Changes emphasis on ...
-
Crescent Ranger District (Or.)
(2002-05-28)
Announces decision implementing Alternative 2 of project EA, authorizing the sale of a .8-acre parcel of National Forest land through a competitive bidding process.
-
Crescent Ranger District (Or.)
(2001-07)
Proposes to sell a .8-acre parcel of National Forest land through a competitive bidding process.
-
Crescent Ranger District (Or.)
(2008-05-20)
Announces decision to reissue the special use permit for the 72 privately-owned recreation residences along the shoreline of the Lake. Components include reissuing the permits, forbidding any additional lots beyond the 72 ...
-
Crescent Ranger District (Or.)
(2002-03-08)
Announces decision to implement Alternative 2 of project EA, proceeding with the expansion of the clearing limits of the airport by clearing trees lining the runway to a distance of 75 feet from each side of the existing ...
-
Crescent Ranger District (Or.)
(2002-01)
Proposes to expand the clearing limits at the airport by clearing trees lining the runway to a distance of 75 feet from each side of the existing runway. The total width of the cleared area would total approximately 300 ...
-
Crescent Ranger District (Or.)
(2004-07-14)
Announces decision to implement Alternative 3 modified of project EA, reducing fuels by treating approximately 3900 acres to achieve sustainable vegetative conditions and lower the risk of stand replacement wildfire. ...
-
Crescent Ranger District (Or.)
(2004-04)
Proposes to reduce fuels by treating approximately 3900 acres to achieve sustainable vegetative conditions and lower the risk of stand replacement wildfire. Includes tree and small tree thinning, hand and machine piling ...
-
Crescent Ranger District (Or.)
(2003-05)
Provides analysis at the project level, and is limited in scope to the Crescent Lake WUI area, some 12, 030 acres. Includes setting up the analysis, describing the situation, identifying the issues, assessing benefits, ...
Search Scholars' Bank
Browse
-
All of Scholars' Bank
-
This Collection
My Account
Statistics