Crescent Ranger District (Or.)
(1998-07-06)
Announces the decision to implement the proposed action, with a modification to add 6 acres of aspen enhancement. Includes prescribed underburning of 533 acres, salvaging of 407 acres of dead and
down lodgepole pine, ...
-
Crescent Ranger District (Or.)
(1998-09-30)
Announces decision to implement modified version of Alternative 3 of project EA, understory thinning 5570 acres, harvesting 2.1 MMBF of salvage and 12.4 MMBF, and construction/reconstruction of 10.2 miles of road.
-
Crescent Ranger District (Or.)
(2000-02-28)
Announces decision to include further vegetation management activities with those of Alternative 3 of September 1998. Includes understory thinning of 2762 acres, prescribe burning of 904 acres of fire-tolerant stands to ...
-
Crescent Ranger District (Or.)
(2001-01-12)
Announces decision to implement a modified form version of Alternative 4 of project EA, constructing a new channel and re-routing the Creek to avoid impacting the campground as much as possible. Modifications include ...
-
Crescent Ranger District (Or.)
(2001-02-23)
Announces decision to implement remaining portions of Alternate 3 of September 1998, including understory thinning, prescribed burning of fire-tolerant stands to relieve density, and harvesting of timber and salvage.
-
Crescent Ranger District (Or.)
(2001-04-04)
Announces decision to implement Alternative 2 of the project EA, amending the Deschutes National Forest Land and Resource Management Plan (Forest Plan) to incorporate management direction changes. Changes emphasis on ...
-
Crescent Ranger District (Or.)
(2001-07)
Proposes to address opportunities for restoring ecosystems identified during the Odell Watershed Analysis (1999), Big Marsh Watershed Analysis (1997), and to implement the management strategy defined for the Davis Late ...
-
Crescent Ranger District (Or.)
(2001-07)
Proposes to sell a .8-acre parcel of National Forest land through a competitive bidding process.
-
Crescent Ranger District (Or.)
(2001-07-23)
Announces decision to restore ecosystems identified during the Odell Watershed Analysis (1999), Big Marsh Watershed Analysis (1997), and to implement the management strategy defined for the Davis Late Successional Reserve ...
-
Crescent Ranger District (Or.)
(2001-11-01)
Announces, based on the original EA, a plant survey result, and an amended biological assessment, implementation of the remaining portion of the modified Alternative 3 within the range of the northern spotted owl. Includes ...
-
Crescent Ranger District (Or.)
(2002-01)
Proposes to expand the clearing limits at the airport by clearing trees lining the runway to a distance of 75 feet from each side of the existing runway. The total width of the cleared area would total approximately 300 ...
-
Crescent Ranger District (Or.)
(2002-03-08)
Announces decision to implement Alternative 2 of project EA, proceeding with the expansion of the clearing limits of the airport by clearing trees lining the runway to a distance of 75 feet from each side of the existing ...
-
Crescent Ranger District (Or.)
(2002-05-28)
Announces decision implementing Alternative 2 of project EA, authorizing the sale of a .8-acre parcel of National Forest land through a competitive bidding process.
-
Crescent Ranger District (Or.)
(2002-09)
Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from ...
-
Crescent Ranger District (Or.)
(2002-11-05)
Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from ...
-
Crescent Ranger District (Or.)
(2002-12)
Analyzes road conditions on the 80,375 acres of the watershed, in an area of unevenly distributed roads. Six-part process consists of: setting up the analysis, describing the situation, identifying the issues, assessing ...
-
Crescent Ranger District (Or.)
(2003-05)
Provides analysis at the project level, and is limited in scope to the Crescent Lake WUI area, some 12, 030 acres. Includes setting up the analysis, describing the situation, identifying the issues, assessing benefits, ...
-
Crescent Ranger District (Or.)
(2003-08)
Announces categorical exclusion of project implementing hazardous fuel treatments on 825 acres of BLM-managed lands and 38 acres of Forest Service lands. Includes actions against shrub and lodgepole pine seedlings overgrowth, ...
-
Crescent Ranger District (Or.)
(2003-09-29)
Announces decision to implement 12 miles of hazard tree removal on main roads within the Davis Fire area, including selected major roads within and along the perimeter. Includes felling all dead trees over 6 inches in ...
-
Crescent Ranger District (Or.)
(2003-10)
Provides analysis at the project level, and is limited in scope to the Davis Fire area and the Closure area, some 21,000 acres. Includes description of the situation; assessment of the benefits, problems, and risks; ...