Scholars' Bank will
be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected
on 9/16. Stay tuned for more updates!
Browsing Willamette National Forest by Title
Navigation
Display Options
Results
-
Willamette National Forest (Agency : U.S.)
(2008-09-05)
Approves project implementing timber harvest on 915 acres for
a gross estimate of 12.3 million board feet (MMBF) of Forest products. Natural fuels underburning will occur within two units on approximately 49 acres with ...
-
Willamette National Forest (Agency : U.S.)
(2008-07)
Proposes to respond to the purpose and need by implementing timber harvest on 915 acres for
a gross estimate of 12.3 million board feet (MMBF) of Forest products. Natural fuels underburning will occur within two units on ...
-
Middle Fork Ranger District (Or.)
(2004-02)
Proposes to close 36 roads (approximately 27 miles) for the next five years to achieve hydrologic stability in portions of the Fall Creek and Little Fall Creek watersheds. Includes moving some trail signs and some culverts ...
-
Middle Fork Ranger District (Or.)
(2004-05-27)
Announces decision to implement Alternative B of project EA, closing 36 roads, approximately 27 miles, on the Middle Fork district. Four roads would have eight culverts completely removed from the road fill and hauled from ...
-
Detroit Ranger District (Or.)
(2007-01)
Announces decision to implement Alternative 5 of the project EA, implementing timber harvest on approximately 751 acres, modified by converting some of the regeneration units to thinning units, and altogether dropping two ...
-
Detroit Ranger District (Or.)
(2006-11)
Proposes to harvest timber in overstocked, managed stands over 40 years-old and overstocked, 100 year-old fire regenerated stands on about 985 acres, with commercial thinning on 926 acres and regeneration harvest on 59 ...
-
McKenzie River Ranger District (Or.)
(2008-04-18)
Announces decision to implement Alternative B of the project EA, to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The ...
-
McKenzie River Ranger District (Or.)
(2008-03)
Proposes to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The objectives would be to restore structural diversity in ...
-
Detroit Ranger District (Or.)
(2003-04-14)
Announces decision to decommission .8 miles of road, including Road 2234-175 and its spurs to revegetate with forage seed and transplant trees at the entrance, providing a more effective barrier to off-highway vehicle use. ...
-
McKenzie River Ranger District (Or.)
(2005-05)
Proposes to implement a Master Plan that identifies a variety of improvements proposed to upgrade facilities and services for campers, comply with Americans with Disabilities Act and other special requirements, enhance the ...
-
Middle Fork Ranger District (Or.)
(2004-04-16)
Supplement, pursuant to an opinion and order from a 2003 lawsuit, discusses management of red tree voles, a Survey and Manage species, for the Clark timber sale of 1998 in the North Fork of Fall Creek drainage within the ...
-
Middle Fork Ranger District (Or.)
(2003-12-12)
Announces decision to salvage downed logs and certain trees identified as potential hazard trees along the Fall Creek Road (18), as well as Roads 1817, 1821, 1828, and 1830, and spurs within the perimeter of the Clark Fire. ...
-
Detroit Ranger District (Or.)
(2003-06-11)
Announces decision to implement Alternative 2 of the project EA, approving the Draft Management Plan for three Detroit Lake State Park properties and identifying the conditions for a 20-25 year special use permit to be ...
-
Detroit Ranger District (Or.)
(2003-05)
Proposes to: a) issue a 20-25 year special use permit to the Oregon Department of Parks and Recreation to manage sites in the Detroit Lake State Park, Tumble Creek Point, and Mongold Day Use Area, b) approve a master plan ...
-
Willamette National Forest (Agency : U.S.)
(2007-07-02)
Announces decision to implement Alternative 2 of project EA, to close up to 23 miles of roads in the Echo, Staley, Simpson, and Noisy Creek drainages within the Upper Middle Fork watershed to motorized traffic, and place ...
-
Willamette National Forest (Agency : U.S.)
(2007-04)
Proposes to close up to 23 miles of roads in the Echo, Staley, Simpson, and Noisy Creek drainages within the Upper Middle Fork watershed to motorized traffic, and place about 21 miles of these roads into maintenance storage ...
-
Middle Fork Ranger District (Or.)
(2005-01)
Announces decision to implement Alternative C to restore area burned by the Clark Fire in 2003 that provides for public safety, ensures the re-establishment of the forest setting, restores the riparian habitat, manages ...
-
Middle Fork Ranger District (Or.)
(2005-01)
Promises to restore area burned by the Clark Fire in 2003 that provides for public safety, ensures the re-establishment of the forest setting, restores the riparian habitat, manages forest fuels and coarse woody debris, ...
-
Middle Fork Ranger District (Or.)
(2005-03-30)
Announces decision to implement stream enhancement component of Alternative C of the project EA, falling about 70-90 hazard trees into Fall Creek to provide large woody debris structure to enhance the stream environment ...
-
McKenzie River Ranger District (Or.)
(2002-06-14)
Proposes actions to develop an interpretive gateway facility to the historic Fish Lake Remount Depot, educating the public about the site's significance, making historic features more visible and accessible, and controlling ...
Search Scholars' Bank
Browse
-
All of Scholars' Bank
-
This Community
My Account
Statistics