Scholars' Bank will be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected on 9/16. Stay tuned for more updates!

Transportation plans: Recent submissions

  • Canby (Or.) (City of Canby (Or.), 2000-04-19)
    In accordance with the Transportation Planning Rule (TPR), OAR 660 Division 12, a comprehensive analysis of the transportation system within the City of Canby has been prepared. Included is an analysis of existing ...
  • Carlton (Or.) (City of Carlton (Or.), 1999-12)
    This transportation system plan (TSP) addresses the anticipated transportation needs for the year 2018. The TSP is being prepared to address federal and state regulations that require urban areas to do longrange planning. ...
  • Athena (Or.); David Evans and Associates (City of Athena (Or.), 2001-02)
    The City of Athena Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Aurora (Or.) (City of Aurora (Or.), 2002-01-08)
    This transportation system plan (TSP) addresses the anticipated transportation needs for the year 2018. The TSP is being prepared to address federal and state regulations that require urban areas to do longrange planning. ...
  • Aurora (Or.); Oregon Downtown Development Association; Hilliard, Vicki D.; Henry, Heidi E.; Dortignacq, Robert; Huntington, Wallace (City of Aurora (Or.), 2000-04)
    The design team [for this Plan] worked with designated representatives of ODDA and Aurora. Work was based, in part, upon comments from prior studies including; Vision Aurora (1995), City of Aurora Transportation Plan (1999), ...
  • Keizer (Or.); Mid Willamette Valley Council of Governments; Salem (Or.) (Mid Willamette Valley Council of Governments, 2005-06)
    The RTSP is based on 20-year projections of population, employment, and land use in the Salem-Keizer area. It provides a comprehensive, long-range plan for meeting our transportation needs over the next 20 years. The ...
  • Baker City (Or.); David Evans and Associates (City of Baker City (Or.), 1996-08-29)
    The Baker City Transportation System Plan guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Arlington (Or.); David Evans and Associates (City of Arlington (Or.), 1999-08)
    The City of Arlington Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities within the city's Urban Growth Boundary (UGB) for ...
  • Adams (Or.); David Evans and Associates; Oregon. Dept. of Transportation (City of Adams (Or.), 2003-04-08)
    The Adams Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan constitutes ...
  • Hillsboro (Or.); DKS Associates (City of Hillsboro (Or.), 2004-01)
    The TSP provides specific information regarding transportation needs to guide future transportation investment in the City and to determine how land use and transportation decisions can be coordinated beneficially for ...
  • Sherwood (Or.); DKS Associates (City of Sherwood (Or.), 2005-03-15)
    This Sherwood Transportation System Plan (TSP) identifies projects and programs needed to support the Cityâ s Goals and Policies and to serve planned growth over the next 20 years. This document presents the investments ...
  • Lake Oswego (Or.); Lake Oswego (Or.). Parks & Recreation Dept.; Alta Planning and Design (City of Lake Oswego (Or.), 2003-06-17)
    The Plan proposes the development of a hierarchical trail system that integrates regional, community connector, and local access trails ....This hierarchical system of trails...gives community members a wide variety ...
  • Ashland (Or.); W&H Pacific (City of Ashland (Or.), 1998-04)
    The City of Ashland has committed to developing a well planned, comprehensive transportation system that balances the needs of future land development with a system that serves all users. In the development of the TSP, the ...
  • Ashland (Or.). Public Works Dept.; Ashland (Or.). Dept. of Community Development; Lewis, David R.; United States. National Park Service. Rivers, Trails, and Conservation Assistance Program; Ashland (Or.); Ashland (Or.). Parks and Recreation Dept. (City of Ashland (Or.), 2006-02-07)
    A Trails Master Plan TMP is essential for accomplishing the community trails Vision which is to provide Ashland with â A diverse network of trails that connects downtown, schools, neighborhoods, and surrounding areas.â ...
  • Otak, Inc.; MIG, Inc.; Lake Oswego (Or.); DKS Associates (City of Lake Oswego (Or.), 2006-05-17)
    The Lake Oswego Transportation Management Plan for Downtown Neighborhoods was initiated as a citizen driven project to identify and analyze existing and potential future transportation impacts to the neighborhoods which ...
  • Gresham (Or.); David Evans and Associates; Sea Reach Ltd.; Studio Reedijk (City of Gresham (Or.), 1997-08)
    The 1995 City of Gresham Parks, Recreation & Open Space Master Plan recommends the development of a Trails Master Plan to define "a comprehensive trail system which integrates with the City's pedestrian and bicycle plan ...
  • Wilsonville (Or.); Alta Planning and Design (City of Wilsonville (Or.), 2006-12)
    Throughout the planning processes, the community expressed key priorities, including: improving access to and across the Willamette River; providing a comprehensive system of bikeways and walkways; developing a pool ...
  • Lango Hansen Landscape Architects; Glumac International; KPFF Consulting Engineers; Sherwood (Or.); Sherwood (Or.). Engineering Dept. (City of Sherwood (Or.), 2003-12-09)
    The Downtown Sherwood Streetscape Master Plan was developed over a six month period in 2003. The design consultant team was comprised of landscape architects, civil engineers and lighting designers. The consultant ...
  • Prineville (Or.); Oregon. Dept. of Transportation (City of Prineville (Or.), 2005)
    In 1994, the City of Prineville developed a transportation system plan (TSP) to serve as a guide for the management of existing transportation facilities and the design and implementation of future facilities.... A major ...
  • Gresham (Or.) (City of Gresham (Or.), 1991-09)
    The Gresham section of the Springwater Trail Corridor being developed within the abandoned Portland Traction Company railroad right-of-way will form a significant segment of the 40 Mile Loop regional trail system, and is ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics