Scholars' Bank will be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected on 9/16. Stay tuned for more updates!

Transportation plans: Recent submissions

  • Florence (Or.); Lane Council of Governments (Or.) (City of Florence (Or.), 2002-01-14)
    The City of Florence, Oregon has developed a Draft Transportation System Plan (TSP), as required by the State's Transportation Planning Rule (TPR) and as part of the City's update of its Comprehensive Plan. Adoption of ...
  • Gladstone (Or.); Picco, Thomas J. (City of Gladstone (Or.), 1995-06)
    In Gladstone, the TSP provides the city the opportunity to address transportation issues of local concern within the context of regional transportation systems. Particular issues that have been examined, and proposed ...
  • Estacada (Or.); Kittelson & Associates (City of Estacada (Or.), 1999-05)
    This study was prepared as part of a Transportation Growth Management Grant. Although the population of Estacada does not meet the threshold level identified by State of Oregon legislation requiring local jurisdictions ...
  • Dayville (Or.); David Evans and Associates (City of Dayville (Or.), 1997-06)
    The Dayville Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • Depoe Bay (Or.); TriLand Design Group; CTS Engineers; Foster Consultants (City of Depoe Bay (Or.), 2001-06-13)
    The City of Depoe Bay received a State of Oregon grant to prepare a Transportation System Plan (TSP). The TSP results in a plan to satisfy the community's transportation needs and desires for the next 20 years. The TSP is ...
  • Echo (Or.); David Evans and Associates; Umatilla County (Or.); Oregon. Dept. of Transportation (City of Echo (Or.), 2001-06)
    The City of Echo Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan ...
  • Enterprise (Or.); Wallowa County (Or.); David Evans and Associates (City of Enterprise (Or.), 1999-02)
    The Enterprise Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Bandon (Or.); Bandon (Or.). Planning Dept.; JRH Transportation Engineering; Oregon. Dept. of Transportation (City of Bandon (Or.), 2000-10)
    The TSP will establish a system of transportation facilities and services adequate to meet the City of Bandon's identified transportation needs for the next twenty years. It will be consistent with the County TSP and ...
  • Cave Junction (Or.); Rogue Valley Council of Governments; Stein Engineering and Planning Services (City of Cave Junction (Or.), 2001-07)
    Recognizing the need for a safe and efficient transportation system, the City of Cave Junction hs initiated an update of the existing transportation element, which was adopted in 1984. The purpose of the plan is to: 1) ...
  • Coquille (Or.); JRH Transportation Engineering (City of Coquille (Or.), 1997-11-15)
    The purpose of this report is to describe the existing transportation system in Coquille and present policies that are consistent with statewide land-use and transportation policies. Specifically, this report: presents an ...
  • Cornelius (Or.); DKS Associates (City of Cornelius (Or.), 2005-06-20)
    The current Cornelius Transportation System Plan (TSP) was adopted in June 1995. Since that time, the City has grown by an estimated 50% in population, depleted much of its vacant land inventory and projected significant ...
  • Corvallis (Or.) (City of Corvallis (Or.), 1996-08-05)
    In May of 1991, at the direction of the Corvallis City Council, the City of Corvallis initiated an update of the Corvallis Transportation Plan. The effort was initiated for the following reasons: to set measurable goals ...
  • Cottage Grove (Or.); Lane Council of Governments (Or.) (City of Cottage Grove (Or.), 1998-08)
    The Cottage Grove Transportation System Plan (TSP) establishes transportation goals and objectives for the Cottage Grove area. The TSP addresses all forms or modes of transportation, primarily focusing on automobile, ...
  • Creswell (Or.); Lane Council of Governments (Or.) (City of Creswell (Or.), 1998-01)
    The City of Creswell in coordination with Lane County and the Oregon Department of Transportation (ODOT) initiated a study of the city's transportation system in May 1996. The purpose of the study is to provide a long-range ...
  • Dallas (Or.); CH2M Hill, inc. (City of Dallas (Or.), 2005-06)
    The City of Dallas (City), in association with the Oregon Department of Transportation (ODOT), has prepared a Transportation System Plan (TSP) that addresses the transportation issues and system needs within the City’s ...
  • Dayton (Or.); Mid Willamette Valley Council of Governments (City of Dayton (Or.), 2001-05)
    The Dayton TSP is a statement of current conditions of the local transportation system and specific directions for improvements that will increase transportation alternatives in Dayton. Those transportation improvements ...
  • Adrian (Or.); W&H Pacific; TriLand Design Group (City of Adrian (Or.), 2001-06-07)
    The plan was developed through a series of technical analyses combined with input from County and ODOT staff. Key elements of the process included: involving the City of Adrian (Chapter 1); reviewing Existing Plans and ...
  • Cogan Owens Cogan (Firm); Astoria (Or.); David Evans and Associates (City of Astoria (Or.), 1999-07)
    This Transportation System Plan (TSP) has been completed to help provide direction for transportation systems i~ the Astoria urban area over the next 20 years, as well as to meet federal, state, and local transportation ...
  • Bay City (Or.); CH2M Hill, inc.; Angelo Eaton & Associates; Alta Planning and Design; Oregon. Dept. of Transportation (City of Bay City (Or.), 2003-06)
    The Bay City Downtown Transportation Plan addresses key transportation issues in the downtown area. These include street design (including cross sections, traffic circulation, onstreet parking, pedestrian and bicycle ...
  • Brookings (Or.); David Evans and Associates; H. Lee & Associates (City of Brookings (Or.), 2002-08)
    The City of Brookings Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics