Abstract:
Announces decision to implement Alternative B of project EA, with mitigation measures, to remove 13 existing toilets at 11 different recreational sites, install 14 toilets at the same 11 recreational sites, install 4 new toilets at 4 other recreational sites, and replace 3 drainfields and replace/relocate 1 drainfield.
Description:
6 pp. Tables.
T 17 S, R 8 E, Section 10, 11; T 18 S, R 8 E, Section 5, T 20 S, R 12 E, Section 28; T 18 S, R 11 E, Section 3; T 18 S, R 9 E, Section 18; T 18 S, R 10 E, Section 28, 30; T 22 S, R 12 E, Section 2; T 12 S, R 8 E, Section 19; T 17 S, R 9 E, Section 11, 14; T 13 S, R 8 E, Section 26.