NEPA Documents (BLM): Recent submissions

  • United States. Bureau of Land Management. Prineville District (2009-01-22)
    Approves plan renewing the grazing lease for ten years with no changes in terms and conditions.
  • United States. Bureau of Land Management. Lakeview District (2008-07-15)
    Burlington-Northern Railway wants to replace the existing building on the communication site with a new prefabricated concrete structure. The new construction will be within the footprint of the Burlington Right-of-way ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-29)
    Finds no adverse environmental impacts in project proposing commercial timber harvest on approximately 850 acres, post-harvest fuel reduction in the Matrix through prescribed fire, biomass, and thinning on about 1221 acres, ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-29)
    Implements timber harvest on approximately 850 acres, post-harvest fuel reduction in the Matrix through prescribed fire, biomass, and thinning on about 1221 acres, provide riparian habitat restoration, and road resurfacing, ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-28)
    Finds no environmental impact statement is needed for project where Quicksilver has applied for a road use right-of-way to haul approximately 40 loads of Green Chips from a timber sale in California to Collins Products in ...
  • United States. Bureau of Land Management. Lakeview District (2008-08-27)
    Determines no environmental impact statement is needed for project including 15 acres of commercial timber harvest, 24 acres of fuel reduction, 9 acres of vegetation treatments, 5 acres of aspen restoration, 5 acres of ...
  • United States. Bureau of Land Management. Lakeview District (2008-08-27)
    Announces decision to implement project including 15 acres of commercial timber harvest, 24 acres of fuel reduction, 9 acres of vegetation treatments, 5 acres of aspen restoration, 5 acres of prescribed fire, and road ...
  • United States. Bureau of Land Management. Lakeview District (2008-08-01)
    The purpose of the proposed action is to decommission or valve these wells such that they cease to continually discharge water. All five wells will be accessed by truck, ATV or boat. The top of the pipe (casing) will be ...
  • United States. Bureau of Land Management. Lakeview District (2008-10-29)
    Announces decision to implement prescribed underburning on approximately 1,987 acres.
  • United States. Bureau of Land Management. Lakeview District (2008-09-15)
    Excludes from further NEPA documentation, project initiating approximately 130 acres of conifer thinning in riparian reserves in the Gerber Reservoir watershed that will be treated by hand cutting. Approximately 100 acres ...
  • United States. Bureau of Land Management. Lakeview District (2008-10-22)
    The approved action will result in the implementation of the Buck 23 Timber Sale within the analysis area. Approximately 3.06 million board feet of timber will be harvested from approximately 378 acres of matrix lands and ...
  • United States. Bureau of Land Management. Lakeview District (2008-07-10)
    Proposal includes 15 acres of commercial timber harvest, 24 acres of fuel reduction, 9 acres of vegetation treatments, 5 acres of aspen restoration, 5 acres of prescribed fire, and road improvement and renovation.
  • United States. Bureau of Land Management. Lakeview District (2008-12-02)
    Excludes from further NEPA documentation, project using a chainsaw to fall the existing pole with an osprey platform on it just north of the Wood River Wetland pumping station. Transport the pole and platform with a tracked ...
  • United States. Bureau of Land Management. Eugene District (1998-02)
    The Introduction chapter consists of a general description of the watershed and watershed analysis. The Characterization chapter summarizes the current conditions of important resources in the watershed such as soils, ...
  • United States. Bureau of Land Management. Eugene District (2008-06-18)
    Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the proposed Camp Run Project (EA-OR090-07-06) was prepared by the Upper Willamette Resource Area, Eugene District of the Bureau of Land ...
  • United States. Bureau of Land Management. Eugene District (2007-06-25)
    Announces implementation of repairing one road and decommissioning another damaged by storms. Includes restoring road surface, realigning road, installing crossdrains and culverts, removing about twelve trees, and revegetating ...
  • United States. Bureau of Land Management. Eugene District (2008-12-10)
    Actions analyzed in this EA include density management and commercial thinning, riparian enhancement treatments, botanical restoration treatments, culvert replacements/removals, and road construction, renovation, ...
  • United States. Bureau of Land Management. Eugene District (2008-08-08)
    An Environmental Assessment (EA) and Finding of No Significant Impacts (FONSI) for the proposed McKenzie Tribs Projects (EA-OR090-08-01) were prepared by the Upper Willamette Resource Area, Eugene District of the Bureau ...
  • United States. Bureau of Land Management. Coos Bay District (2008-10-10)
    Announces decision approving project, implementing commercial thinning totaling 131 acres and density management thinning totaling 55 acres in dense conifer stands. The Mister Slate CT Timber Sale will require construction ...
  • United States. Bureau of Land Management. Coos Bay District (2008-10-10)
    Announces no further analysis is required on project. Under the Special Forest Products Program, contracts, including permits and tags, would be offered and administered for harvesting a variety of special forest products. ...