JavaScript is disabled for your browser. Some features of this site may not work without it.
Scholars' Bank will
be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected
on 9/16. Stay tuned for more updates!
Proposed project provides continued grazing while assuring that
livestock management is consistent with the Malheur National Forest Plan and/or moves
toward meeting aquatic and other resource Forest Plan standards, as ...
Malheur National Forest (Agency : U.S.)(2008-12-18)
Announces decision choosing Alternative 2 of project EA with modifications. Approximately 3890 acres would receive treatment, including 2,668 acres of mechanical
treatment (1,811 acres of commercial harvest, 799 acres of ...
Proposes that approximately 3890 acres would receive treatment, including 2,668 acres of mechanical
treatment (1,811 acres of commercial harvest, 799 acres of precommercial thinning and
58 acres of old growth fire hazard ...
The project would involve approximately 7,230 acres of forest
management treatments and integrated design elements. Proposed treatment and harvest
operations would include: harvest activities (commercial thinning, ...
Blue Mountain Ranger District (Or.); David Evans and Associates; Duck Creek Associates(2003-06-20)
Characterizes ecological and physical processes at multiple spatial scales by systematically uncovering the interactions of biological, physical, and human processes that have created current conditions. Identifies key ...
Promises to promote ecologically sustainable upland forest vegetation and to improve water quality, as past timber harvest and lack of prescribed fire have left many of the forested stands overstocked, and many of the roads ...
Environmental assessment proposes to continue authorization of grazing, and to maintain and improve desired resource conditions on key management sites, including all aspen stands; all unsatisfactory range conditions at ...
Announces decision to salvage approximately 209 acres of dead and dying trees burned by the 13,535-acre fire in 2002. Includes construction of about 300 feet of temporary access road, economic value recovery from about ...
Emigrant Creek Ranger District (Or.); Blue Mountain Ranger District (Or.)(2003-07)
Proposes to conduct restoration activities in order to reduce road-related impacts, improve riparian conditions, adjust dedicated old growth areas, capture the economic value of surplus trees, and improve the health, vigor, ...
FEIS proposes to salvage dead and dying trees in approximately 3,668 acres and remove potential danger trees for public safety for about 24.3 miles along haul routes and open forest travel routes. Also includes planting ...
Environmental assessment proposes to amend Malheur Management Plan, changing the status of the proposed Shaketable Research Natural Area (RNA) on the Blue Mountain RD to an established RNA status. Would contribute to the ...
Provides a mid-scale review of 7 subwatersheds in the Middle Fork of the John Day River in supplement to Ecosystem Analysis at the Watershed Scale--Galena Watershed Analysis (1999). Describes the five alternatives of ...
Blue Mountain Ranger District (Or.); Prairie City Ranger District (Or.)(2005-06)
Proposes to provide grazing while assuring that livestock management is consistent with Malheur Forest plan and moves toward meeting aquatic and other standards. Includes combining 8 allotments into 6 and continuing ...
Proposes to salvage dead and dying trees in approximately 3,907 acres and remove potential danger trees for public safety for about 43.4 miles along haul routes and open forest travel routes. Also includes reforestation ...
Environmental assessment proposes the expansion of the Pit to provide a long-term, economical, and readily accessible source of aggregate material that meets quality standards for transportation standards. The Oregon ...
Proposes to reduce hazardous fuels in a portion of the Wildlife Urban Interface designated by the Grant County Community Fire Protection Plan adjacent to County Road 20, an evacuation corridor from the at-risk communities ...
FEIS proposes four alternatives to promote a change in species composition and structure, decommission and close roads, adjust old growth boundaries, capture the economic value of trees, develop wildlife habitats, reduce ...
Malheur National Forest (Agency : U.S.)(2004-10-05)
Environmental assessment proposes to improve Guard Station built by Civilian Conservation Corps, planning to 1) convert an
existing warehouse/bunkhouse into more
bunkhouse space, 2) reconstruct building
foundations that ...
Proposes to promote a change in species composition and structure, decommission and close roads, adjust old growth boundaries, capture the economic value of trees, develop wildlife habitats, reduce fire fuels, and implement ...
Environmental assessment proposes to take action on hazardous fuel reduction and related needs along the 16 Road area forested public travel corridor identified in the Grant County Community Fire Protection Plan as containing ...