  • Bend-Fort Rock Ranger District (Or.) (2000-11)
    Proposes to authorize a special use permit for construction, maintenance and operation of a permanent vehicle weigh and safety station on the northbound land of US Highway 97 south of Bend, between mileposts 145 and 148 ...
  • Bend-Fort Rock Ranger District (Or.) (2001-06)
    Proposes to authorize the issuance of a long-term special use permit for operation of the Oregon Museum of Science and Industry's Cascade Science School, and the adoption of the Master Development Plan which modernizes its ...
  • Bend-Fort Rock Ranger District (Or.) (2002-01-11)
    Proposes to recover commercial timber value from fires caused by the Crane complex fire by salvaging dead and dying trees, reforesting burned areas, reducing fuel accumulations resulting from the fire, and restoring wildfire ...
  • Bend-Fort Rock Ranger District (Or.) (2001-09-25)
    Announces decision to implement Alternative 3 of project EA, deferring the decision to close the vacant Gebhardt Flat Range Allotment, and treating 4520 acres with vegetation and/or fuel treatments. Includes prescribed ...
  • Bend-Fort Rock Ranger District (Or.) (2001-08-30)
    Proposes to preserve and protect cave resources of the eight caves located within the Arnold lava tube system and Skeleton Cave by making adjustments designed to reduce or eliminate impacts to caves and cave resources from ...
  • Bend-Fort Rock Ranger District (Or.) (2001-06)
    Proposes to preserve and protect cave resources of the eight caves located within the Arnold lava tube system and Skeleton Cave by making adjustments designed to reduce or eliminate impacts to caves and cave resources from ...
  • Bend-Fort Rock Ranger District (Or.) (2001-12-26)
    Announces decision to implement Alternative 3 of project EA, authorizing vegetation management activities on approximately 5283 acres. Includes closing 63 miles of road, resurfacing 12 miles of roads, designating 32 dispersed ...
  • Bend-Fort Rock Ranger District (Or.) (2001-12-04)
    Proposes to recover commercial timber value from the Crane complex fire by salvaging dead and dying trees, reforesting burned areas, reducing fuel accumulations resulting from the fire, and restoring wildfire habitat and ...
  • Bend-Fort Rock Ranger District (Or.) (2002-01-07)
    Proposes to respond to problematic conditions for the area surrounding Crane Prairie and Wickiup Reservoirs such as high stand densities, insect and disease infestations, and shifts in species compositions within the dry ...
  • Bend-Fort Rock Ranger District (Or.) (2001-11-21)
    Proposes to respond to problematic conditions in the area surrounding Crane Prairie and Wickiup Reservoirs such as high stand densities, insect and disease infestations, and shifts in species compositions within the dry ...
  • Bend-Fort Rock Ranger District (Or.) (2002-01-31)
    Proposes to construct a 100-foot steel lattice tower up to 3 available platforms to house radio transmitting antennas and/or similar equipment to collocate additional users to be utilized for a broadband PCS facility. Also ...
  • Bend-Fort Rock Ranger District (Or.) (2002-04-10)
    Announces decision to implement Alternative B of project EA, providing accessibility, safety, and positive aesthetics for the visiting public along the north rim of the Paulina Creek. Includes constructing a rock overlook ...
  • Bend-Fort Rock Ranger District (Or.) (2002-03-06)
    Proposes to provide accessibility, safety, and positive aesthetics for the visiting public along the north rim of Pauline Creek. Includes constructing a rock overlook on the north side of the Creek with a metal railing on ...
  • Bend-Fort Rock Ranger District (Or.); Sisters Ranger District (Or.) (2002-01-31)
    Announces decision to implement Alternative B of project EA, with mitigation measures, to remove 13 existing toilets at 11 different recreational sites, install 14 toilets at the same 11 recreational sites, install 4 new ...
  • Bend-Fort Rock Ranger District (Or.) (2002-06-17)
    Announces decision to implement Alternative C of project EA, modified to sell 480 acres of Forest land identified in the Townsite Act application to the OWW2 Sanitary District, which would use the property for wastewater ...
  • Bend-Fort Rock Ranger District (Or.) (2001-11-07)
    Proposes to sell 240 acres of Forest land identified in the Townsite Act application to the OWW2 Sanitary District, which would use the property for wastewater facilities in conjunction with improvements to sewage treatment ...
  • Bend-Fort Rock Ranger District (Or.) (2002-04-10)
    Proposes to reconstruct 34 miles of existing trail, relocate approximately 2 trail miles that are located in areas of soil and erosion concern, construct about 3 miles of new mostly mountain bike trail, and provide signs ...
  • Bend-Fort Rock Ranger District (Or.) (2003-08)
    Announces decision to implement Alternative C of project EA, closing Skyliner Snooper area to snow play, and providing a new snow play area and shelter at Wanoga.
  • Bend-Fort Rock Ranger District (Or.) (2003-03)
    Announces decision to categorically exclude authorization of a special 5-year use permit to Rock Springs Guest Ranch for the non-exclusive use of approximately 25.3 miles of trail and road. Includes constructing .3 miles ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces decision to categorically exclude project constructing a 15 x 15 foot log shelter and a handicapped-accessible toilet at Six Mile. A vault toilet, which is handicapped-accessible, will be constructed onsite at Six Mile.