Scholars' Bank will be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected on 9/16. Stay tuned for more updates!

Forest Service: Recent submissions

  • Siuslaw National Forest (Agency : U.S.) (2007-05-18)
    Announces decision to implement Alternative 2 of the project EA, providing limits on amounts, location, and/or method of collection to control overharvesting of special forest products, ensuring consistent administration ...
  • Hebo Ranger District (Agency : U.S.) (2006-11-13)
    Announces decision to implement Alternative 2 of the project EA (with the exception of Unit 8), to thin commercially 347 acres of young managed conifer stands in the vicinity of Deadwood Mountain and Pea Ridge, to realign ...
  • Hebo Ranger District (Agency : U.S.) (2006-04)
    Proposes to improve watershed and habitat for aquatic and terrestrial species by thinning commercially 347 acres of young managed conifer stands in the vicinity of Deadwood Mountain and Pea Ridge, and to realign and ...
  • Siuslaw National Forest (Agency : U.S.) (2007-05-18)
    Proposes to allow commercial special forest product collection, regulate collection, and provide for sustainability of these products while protecting the environment. Action would determine which products may be gathered, ...
  • Detroit Ranger District (Or.) (2007-01)
    Announces decision to implement Alternative 5 of the project EA, implementing timber harvest on approximately 751 acres, modified by converting some of the regeneration units to thinning units, and altogether dropping two ...
  • Detroit Ranger District (Or.) (2006-11)
    Proposes to harvest timber in overstocked, managed stands over 40 years-old and overstocked, 100 year-old fire regenerated stands on about 985 acres, with commercial thinning on 926 acres and regeneration harvest on 59 ...
  • Detroit Ranger District (Or.) (2007-10)
    Announces decision to implement Alternative 2 to begin harvesting timber (including thinning, shelterwood, and regeneration harvest) on about 1668 acres. Includes reopening of 3.5 miles of temporary spur roads and maintenance ...
  • Detroit Ranger District (Or.) (2007-05-02)
    Announces decision to implement Alternative 2, constructing 100 parking places, a scenic overlook, new toilet, picnic tables, wooden rails and barriers, and information and educational signage.
  • Detroit Ranger District (Or.) (2007-03)
    Proposes to promote a safer, family-friendly atmosphere by providing a basic physical infrastructure, reconstructing road and parking areas, limiting capacity and fixing location, delineating and improving trails and ...
  • Detroit Ranger District (Or.) (2007-07)
    Proposes to harvest timber on 1668 acres, yielding about 19 million board feet. Includes about 834 acres of final shelterboard (overstory) removal, 52 acres of shelterboard creation, 3 acres of clearcut with reserves, 633 ...
  • Sweet Home Ranger District (Or.) (2003-03-11)
    Announces decision to implement Article 3 of the project EA, harvesting 3.2 million board feet on 237 acres of existing shelterwood and prelogged overstory units in Matrix land allocation using ground-based logging methods. ...
  • Sweet Home Ranger District (Or.) (2002-08-02)
    Proposes to offer one or more timber sales treating no more than 275 acres in the Parks Creek Subwatershed. Timber will be removed from the existing shelterwood and overstory management prescriptions with ground-based ...
  • McKenzie River Ranger District (Or.) (2002-07)
    Proposes to fall about 204 hazardous trees in 18 acres adjacent to Forest Service Road 19, and include 168 trees in a salvage timber sale that would yield an estimated 200 thousand board feet. The remaining 36 trees would ...
  • McKenzie River Ranger District (Or.) (2001-06)
    Proposes to fall 205 hazardous trees on 22 acres adjacent to state and federal highways, and include 171 trees in a salvage timber sale that would yield an estimated 100 thousand board feet. The remaining 34 trees, including ...
  • McKenzie River Ranger District (Or.) (2002-06)
    Proposes to rehabilitate the 52 year-old West Fork Horse Creek Bridge on Delta Road, including structural repairs throughout, and replacement of portions of the deteriorated glulam truss members. A temporary bridge would ...
  • Middle Fork Ranger District (Or.) (2004-02)
    Proposes to close 36 roads (approximately 27 miles) for the next five years to achieve hydrologic stability in portions of the Fall Creek and Little Fall Creek watersheds. Includes moving some trail signs and some culverts ...
  • Middle Fork Ranger District (Or.) (2004-05-27)
    Announces decision to implement Alternative B of project EA, closing 36 roads, approximately 27 miles, on the Middle Fork district. Four roads would have eight culverts completely removed from the road fill and hauled from ...
  • McKenzie River Ranger District (Or.) (2002-06-14)
    Proposes actions to develop an interpretive gateway facility to the historic Fish Lake Remount Depot, educating the public about the site's significance, making historic features more visible and accessible, and controlling ...
  • McKenzie River Ranger District (Or.) (2005-05)
    Proposes gating roads 2638345 and 2600280, which would preclude motorized public access to 3.2 miles of road, at the request of Giustina Resources, who are concerned about human-caused fire.
  • McKenzie River Ranger District (Or.) (2005-05)
    Proposes to implement a Master Plan that identifies a variety of improvements proposed to upgrade facilities and services for campers, comply with Americans with Disabilities Act and other special requirements, enhance the ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics