Scholars' Bank will be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected on 9/16. Stay tuned for more updates!

Forest Service: Recent submissions

  • Bend-Fort Rock Ranger District (Or.) (2003-07)
    Proposes to reauthorize grazing permits, revise Allotment Management Plans, effect range improvements, and restructure allotment boundaries. Includes authorizing grazing in the Coyote, Cinder Hill, and Pine Martin allotments; ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces categorical exclusion of project replacing old toilet with a new barrier-free, wheelchair-accessible double toilet, which will meet the needs of a high-use trailhead, as well as current technology.
  • Bend-Fort Rock Ranger District (Or.) (2003-08)
    Announces decision to proceed with fuels reduction project, treating 142 subdivision lots on approximately 100 acres of Deschutes County owned land. Includes reducing stand density and fuel loading through the use of ...
  • Bend-Fort Rock Ranger District (Or.); Sisters Ranger District (Or.) (2004-01)
    Announces decision to implement relocation of 8.6 miles and reconstruction of the remaining 61 miles of trail. Includes clearing brush and logs, defining tread, installing or maintaining drain drips and/or water bars, and ...
  • Bend-Fort Rock Ranger District (Or.) (2004-02)
    Proposes to expand campground facilities at Rock Creek and Gull Point campgrounds. Includes constructing campsite access roads, new campsites and associated facilities, camp spurs, water lines and faucets, toilet buildings, ...
  • Bend-Fort Rock Ranger District (Or.) (2004-08)
    Proposes to promote a more stable channel and restore the hydrologic function of Tumalo Creek after the change in stream dynamics following the 1979 Bridge Creek Fire. Includes restoring the channel dimension, pattern, and ...
  • Bend-Fort Rock Ranger District (Or.) (2004-09)
    Announces decision to implement Alternative 2 of the project EA, promoting a more stable channel and restoring the hydrologic function of the Tumalo Creek after the change in stream dynamics following the 1979 Bridge Creek ...
  • Bend-Fort Rock Ranger District (Or.) (2004-04)
    Proposes to improve and protect deer winter range by reducing the risk of insect outbreaks, the spread of disease pathogens and high intensity wildfire that could further jeopardize critical deer habitat, which presently ...
  • Bend-Fort Rock Ranger District (Or.) (2005)
    Announces decision to implement Alternative 3 of project EA, improving and protecting deer winter range by reducing the risk of insect outbreaks, the spread of disease pathogens and high intensity wildfire that could further ...
  • Bend-Fort Rock Ranger District (Or.) (2004-02)
    Proposes to reissue a special use permit of 20 years to the University of Oregon for its research facility, for which it has built 3 telescopes, quarters for visiting researchers and staff, a site manager's residence, ...
  • Bend-Fort Rock Ranger District (Or.) (2005-03)
    Proposes to improve and protect deer winter range by reducing the risk of insect outbreaks, the spread of disease pathogens and high intensity wildfire that could further jeopardize critical deer habitat, which is lacking ...
  • Bend-Fort Rock Ranger District (Or.) (2005-09)
    Proposes to fall and remove live overstory trees excess to cavity nester habitat needs that are greater than equal to 4 inches dbh and less than 21 inches dbh. Includes those with and without dwarf mistletoe, retaining ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2006-08)
    Assesses site consisting of a large collapsed adit and approximately 3000cy of wasterock material adjacent to Granite Creek. A Niton XLt found that most metals at the site exceeded screening criteria for birds, invertebrates, ...
  • Bend-Fort Rock Ranger District (Or.) (2007-02-02)
    Announces decision to implement Alternative 3 with modifications from the 30-day comment period to effect reductions in natural fuels, including reductions in shrub and forest stand densities as well as for providing ...
  • Bend-Fort Rock Ranger District (Or.) (2006-03)
    Describes effects of implementing three alternatives relating to hazardous fuels and tree stand density on 42,655 acres. Includes prescribed burning, mechanical shrub treatment, intermediate and regeneration cutting of ...
  • Bend-Fort Rock Ranger District (Or.) (2004-12-28)
    Announces decision to implement Alternative 4 of the project EA, to relocate the existing state inmate crew camp at Deschutes Bridge gravel pit to Deschutes Bridge Campground rather than the Ogden Group Camp, which would ...
  • Bend-Fort Rock Ranger District (Or.) (2005-09-09)
    Proposes to fall and remove live overstory trees excess to cavity nester habitat needs that are greater than or equal to 4 inches dbh and less than 21 inches dbh. Includes those with and without dwarf mistletoe, retaining ...
  • Bend-Fort Rock Ranger District (Or.) (2007-02-02)
    Proposes to relocate the existing state inmate crew camp at Deschutes Bridge gravel pit to Ogden Group Camp. Includes supplying improved electricity to the camp where none currently exists and new water lines to meet staff ...
  • Bend-Fort Rock Ranger District (Or.) (2008-04)
    Proposes to develop and improve facilities for Nordic skiers. Includes providing 9.7 miles of new trails, removing vegetation along the sides of existing roads and trails, expanding the grooming area, providing a terrain ...
  • Bend-Fort Rock Ranger District (Or.) (2005-10)
    Proposes to reroute a portion of an existing 69-kV power line by constructing a power line corridor for approximately 3.5 miles. Includes removing trees from approximately 12.6 acres, clearing trees, drilling 10-foot deep ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics