Scholars' Bank will be on a content freeze from 9/6 - 9/16 as we transition to a new & improved version. Minimal downtime expected on 9/16. Stay tuned for more updates!

Transportation plans: Recent submissions

  • Ontario (Or.); H. Lee & Associates (City of Ontario (Or.), 2006-01)
    The City of Ontario Transportation System Plan (TSP) addresses the city’s anticipated transportation needs through the year 2025. It has been prepared to meet state and federal regulations that require urban areas to ...
  • Idanha (Or.); CH2M Hill, inc.; Angelo Eaton & Associates (City of Idanha (Or.), 2005-09)
    The Idanha Transportation Study is intended to recommend solutions to improve the transportation system in Idanha. The City of Idanha asked the Oregon Department of Transportation (ODOT) for a study to address the following ...
  • Seneca (Or.); David Evans and Associates (City of Seneca (Or.), 1997-06)
    The Seneca Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • Waldport (Or.); TriLand Design Group; Kittelson & Associates; Macdonald Environmental Planning (Firm) (City of Waldport (Or.), 1999-06-09)
    The City of Waldport has received a State of Oregon grant to prepare a Transportation System Plan (TSP). The Plan will result in a plan to satisfy the community's transportation needs and desires for the 20 year ...
  • Scappoose (Or.); David Evans and Associates (City of Scappoose (Or.), 1997-10)
    The purpose of this study is to develop a community-based multi-modal transportation system plan (TSP) that addresses transportation needs for the year 20 15 associated with anticipated future growth in the Scappoose ...
  • Cascade Locks (Or.) (City of Cascade Locks (Or.), 2001-11-01)
    The TSP was developed through technical analysis combined with input and review by the City of Cascade Locks, a technical advisory committee, a project management team, and the public. This TSP was prepared as part of a ...
  • Wood Village (Or.); Connell, Carole W. (City of Wood Village (Or.), 1999-05)
    The City of Wood Village began its first citywide transportation planning effort in 1998 after receiving a Transportation Growth Management grant from the Oregon Department of Transportation to complete the requirements ...
  • Clatskanie (Or.); Kittelson & Associates (City of Clatskanie (Or.), 1997-08)
    The Clatskanie Transportation System Study is an area-wide study of the comprehensive transportation system in the Clatskanie area. The study was jointly conducted by the Oregon Department of Transportation, the City of ...
  • Elgin (Or.); Union County (Or.). Planning Dept.; Allen, Tracy; Jinings, Jon; Jenkins, Hanley (City of Elgin (Or.), 1996-08-13)
    This Plan addresses the Transportation Planning Rule bicycle and pedestrian requirements for the City of Elgin. The Plan identifies and directs opportunities for developing and improving bicycle and pedestrian facilities ...
  • Willamina (Or.) (City of Willamina (Or.), 1998-08)
    The Willamina TSP includes the following: transportation goals, policies, and objectives; a determination of transportation needs; a street plan for arterials and collectors and standards for the layout of local streets ...
  • Woodburn (Or.); CH2M Hill, inc.; Kittelson & Associates (City of Woodburn (Or.), 2005-09)
    The city of Woodburn (City), in conjunction with the Oregon Department of Transportation (ODOT), initiated an update of the City's 1996 Transportation System Plan (TSP) in 2002. The City of Woodburn Comprehensive Plan ...
  • Mount Angel (Or.); David Evans and Associates; Seder Architects (City of Mount Angel (Or.), 2001-06)
    Mt. Angel wants to enhance and promote its downtown. The challenge has been to keep the downtown friendly and local while making it more attractive to visitors. The City recognized the need to coordinate and expand previously ...
  • Foster Consultants; CTS Engineers; Boardman (Or.); TriLand Design Group (City of Boardman (Or.), 2001-08)
    The downtown development plan must provide accessibility to all modes of travel, accommodate and facilitate business development, intensify land uses, and enhance circulation. The downtown development plan must identify ...
  • Burns (Or.); David Evans and Associates (City of Burns (Or.), 2001-06)
    The Burns Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System Plan constitutes ...
  • Mount Angel (Or.); Mid Willamette Valley Council of Governments (City of Mount Angel (Or.), 2003-06-23)
    The Mount Angel Transportation System Plan is a 20-year document addressing multimodal transportation systems: automobile, bicycling, pedestrian, public transportation, etc. The primary goal of the Transportation Plan is ...
  • Boardman (Or.); Kittelson & Associates; Cogan Owens Cogan (Firm); Murase and Associates; TriLand Design Group (City of Boardman (Or.), 2001-06)
    The City of Boardman, in conjunction with Morrow County and the Oregon Department of Transportation (ODOT), initiated a study of the city's transportation system during the summer of 1998. The purpose of this study was ...
  • Port Orford (Or.); David Evans and Associates; H. Lee & Associates (City of Port Orford (Or.), 2002-09)
    The Port Orford Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • St. Helens (Or.); Parsons, Brinckerhoff, Quade & Douglas; Jeanne Lawson Associates; McKeever/Morris (City of Saint Helens (Or.), 1997-06)
    The purpose of this study is to develop a comprehensive multi-modal transportation system plan (TSP) that meets future transportation needs for the City of St. Helens and its urban growth area. The TSP is intended to ...
  • Vernonia (Or.); KCM, Inc. (City of Vernonia (Or.), 1999-07)
    This Transportation System Plan (TSP) identifies deficiencies of the City of Vernonia's existing transportation system, assesses current and future demands on the system, and outlines a coordinated network of transportation ...
  • Vale (Or.); W&H Pacific; TriLand Design Group (City of Vale (Or.), 1998-02)
    The City of Vale Transportation System Plan (TSP) guides the management of existing and future transportation facilities for the next 20 years. This TSP document satisfies the requirements of the Oregon Transportation ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics